WORKS
Muff Refurbishment & Painting to 105nr Towers across the ZU 275kV Line.
Works included breaking off existing concrete, treating steelwork, muff replacement including painting with two coats of bitumen paint
CLIENT
WORKS
Muff Refurbishment & Painting to 105nr Towers across the ZU 275kV Line.
Works included breaking off existing concrete, treating steelwork, muff replacement including painting with two coats of bitumen paint
CLIENT